Skip to content

Density Test Report

Date :09/21/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :09/21/2022 9:30
Onsite Hours :06:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :sunny
Departure Time :09/21/2022 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/21/2022 1 17.1 102.8 P-2 99.5 22.1 103.3 98 D6938 Pass
Location : 40 feet to the north of keyway , Elv/Depth :-24
Comment : Gauge Serial No. :38069
09/21/2022 2 17.1 100.7 P-2 99.5 22.1 101.2 98 D6938 Pass
Location : 42 feet away from keyway , Elv/Depth :-22 feet from the top of keyway
Comment : Gauge Serial No. :38069
09/21/2022 3 17.1 117.3 P-2 99.5 22.1 100.7 D6938 Pass
Location : 35 feet away from center of keyway , Elv/Depth :-21 feet from the top of keyway
Comment : Gauge Serial No. :38069
09/21/2022 4 20.8 99.3 P-2 99.5 22.1 99.8 98 D6938 Pass
Location : 43 feet to the north side of keyway , Elv/Depth :-20 feet from the top of keyway
Comment : Gauge Serial No. :38069
Technician Signature / DateAminullah Azimi, September 21, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022