Daily Field Report

Date :09/20/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :
Onsite Hours :
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :
Departure Time :
ASEC Technician Name :Nick Smith

Observations/Finding

9/20/22

As requested by CWM James Higgins, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Site Observations:

A proof-roll was performed on the taxiway and shoulder areas from STA 409+00 to STA 408+50.  No severe pumping and/or deflection was noted.

Contractor continued work on the taxiway ares from STA 411+00 to STA 409+00. Fill was placed compaction testing requested.

Density testing was performed using a Troxler nuke gauge (#3430, serial #29588).

Density testing results:
P3 Moisture Density Relationship (proctor) – 118.8 pcf @ 13.0%

T1- elevation 995.8, STA 410+25 center, P3, DD 110.4, M% 15.6, compaction: 92.9%

T2- elevation 995.8, STA 410+25 south end, P3, DD 107.7, M% 14.8, compaction: 90.6%

T3 – elevation 995.8, STA 410+25 north end, P3, DD 109.5, M% 15.4, compaction: 92.2%

Fill being placed on taxiway

Fill being placed on taxiway

Density testing on taxiway

Technician Signature / DateNick Smith, September 20, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022