Skip to content

Density Test Report

Date :09/28/2022
Project No :2022C135
Client Company :Mark Spain
Arrival Time :09/28/2022 9:00
Onsite Hours :08:30
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :cloudy
Departure Time :09/28/2022 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/28/2022 1 27 96.1 P-1 97.3 23.7 98.8 95 D6938 Pass
Location : in keyway 103 feet from west side starting point of the dam, Elv/Depth :-28 from the top of keyway
Comment : Gauge Serial No. :85759
09/28/2022 2 23.8 95.9 P-1 97.3 23.7 98.6 95 D6938 Pass
Location : in keyway 119 feet away from west side starting point of dam, Elv/Depth :-27 from top of keyway
Comment : Gauge Serial No. :85759
09/28/2022 3 26 99.2 P-1 97.3 23.7 102.0 95 D6938 Pass
Location : in keyway 98 feet away from west side starting point of the dam , Elv/Depth :-26 feet from the top of keyway
Comment : Gauge Serial No. :85759
09/28/2022 4 25.3 96.6 P-1 97.3 23.7 99.3 95 D6938 Pass
Location : in keyway 126 feet away from west side of starting point of the dam, Elv/Depth :-25.5 feet from the top of keyway
Comment : Gauge Serial No. :85759
09/28/2022 5 24.4 102.6 P-2 99.5 22.1 103.1 95 D6938 Pass
Location : in keyway 111 feet away from west side starting point of dam, Elv/Depth :-25 from top of keyway
Comment : Gauge Serial No. :85759
09/28/2022 6 24.8 95.2 P-1 97.3 23.7 97.8 95 D6938 Pass
Location : in keyway 117 feet away from west side starting point of the dam, Elv/Depth :-24.5 from top of keyway
Comment : upon arrivel work was already in progress contractor was performing lifts, each lift being 6-8 inches. Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, September 28, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022