Daily Field Report
Date :10/03/2022
Project No :2022C128
Client Company :Century
Arrival Time :10/03/2022 09:00
Onsite Hours :06:00
Name of the Project :Sidney Square, Flowery Branch
Project Location :Flowery Branch
Weather :Sunny
Departure Time :10/03/2022 15:00
ASEC Technician Name :Vidal Dias
Observations/Finding
AS Engineering and Consulting, LLC (ASEC) visited the site at the contractor’s request to observe soil placement on retaining wall #3. The contractor confirmed that the current elevation is approximately +1183 feet. Geogrid has been placed in accordance with the specifications and the soil compaction test results were found to meet job specifications for compaction.
Footings for walls #1 & #2 were being prepared but the remediation process (soil removal and replacement) for wall number #2 has not commenced.
During the evaluation, we observed the construction and installation of drainage pipe between Lots #7 through 12.
Technician Signature / DateVidal Dias, October 3, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022