Skip to content

Daily Field Report

Date :08/08/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :
Onsite Hours :
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :
Departure Time :
ASEC Technician Name :Nick Smith

Observations/Finding

8/08/22

As requested by CWM James Higgins, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Site Observations:

The Localizer area displayed high moisture contents (18-21%) and was required to be scarified and aerated before continuing with the next lift.

Contractor requested a moisture check on the offsite stockpile on Sullivan Rd. Moisture contents measured approximately 14.1%.

Technician Signature / DateNick Smith, August 8, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022