Daily Field Report

Date :08/17/2022
Project No :2021C002
Client Company :CW Matthews
Arrival Time :
Onsite Hours :
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :
Departure Time :
ASEC Technician Name :Nick Smith

Observations/Finding

8/17/22

As requested by CWM James Higgins, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Site Observations:

Contractor continued work on H-Line, the NE end of the taxiway, the Localizer, backfill outside SIDA by Crosswinds Rd., and the area around the A8 structure. Fill was placed and compaction testing requested.
A proof-roll of the area just east of Zone 4, south of the Localizer was performed.  No severe pumping and/or rutting was observed.
A 12″ lift of boulder fill was placed in the ravine east of Zone 4 to stabilize the subgrade.  The area still displayed slight movement so one more lift was placed.

Density testing was performed using a Troxler nuke gauge (#3430, serial #29588).

Density testing results:
P3 Moisture Density Relationship (proctor) – 118.8 @ 13.0
P2 Moisture Density Relationship (proctor) – 141.4 @ 5.7

T1 – elevation 1008.8, localizer pad south side, P3, DD 113.5, M% 12.9, compaction 95.5%

T2 – elevation 1008.8, localizer pad north side, P3, DD 111.6, M% 13.9, compaction 94.0%

T3 – elevation 1008.0, 50′ east of localizer pad, P3, DD 111.3, M% 14.0, compaction 93.7%

T4 – elevation 1008.0, 75′ SE of pad, P3, DD 112.0, M% 13.4, compaction 94.3%

T5 – elevation 1001.5, 20′ south of A8, P3, DD 108.6, M% 12.4, compaction 91.4%

T6 – elevation 1001.5, 50′ south of A8, P3, DD 108.8, M% 13.7, compaction 91.6%

T7 – elevation 1002.0, 40′ east of H1, P3, DD 108.0, M% 12.8, compaction 90.9%

T8 – elevation 1002.2, 5′ south of H2, P3, DD 110.5, M% 13.3, compaction 93.0%

T9 – elevation 1002.5, 10′ west of H3, P3, DD 111.3, M% 12.5, compaction 93.7%

T10 – Outside SIDA fence by crosswinds rd, P2, DD 131.3, M% 2.8, compaction 92.8%

T11 – Outside SIDA fence by crosswinds rd, P2, DD 134.2, M%3.1, compaction 94.9%

Technician Signature / DateNick Smith, August 17, 2022
Reviewer Name / DateKenneth Mosman, October 23, 2022