- Home
- Density Test Report Report ID: 55562
- This project is inactive from admin.Download Report
Density Test Report
Date :11/09/2022
Project No :2022C136
Client Company :Century
Arrival Time :11/09/2022 7:00
Onsite Hours :06:30
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :Sunny
Departure Time :11/09/2022 13:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
11/09/2022 | 1 | 25.6 | 87.7 | P-3 | 96.5 | 22.2 | 90.9 | 95 | D6938 | Fail |
Location : | Lot #60 , Elv/Depth :-2' from finish grade | |||||||||
Comment : | Recompaction and retesting required | Gauge Serial No. :85759 | ||||||||
11/08/2022 | 2 | 22.3 | 89.3 | P-3 | 96.5 | 22.2 | 92.5 | 95 | D6938 | Fail |
Location : | Lot #63, Elv/Depth :-2' from finish grade | |||||||||
Comment : | Recompaction and retesting required | Gauge Serial No. :85759 | ||||||||
11/09/2022 | 3 | 24.1 | 93.5 | P-3 | 96.5 | 22.2 | 96.9 | 95 | D6938 | Pass |
Location : | Lot #58, Elv/Depth :-2' from finish grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
11/09/2022 | 4 | 15 | 104.0 | P-2 | 98.8 | 19.4 | 105.3 | 95 | D6938 | Pass |
Location : | Lot #41, Elv/Depth :-2' from finish grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
11/09/2022 | 5 | 24.7 | 90.1 | P-3 | 96.5 | 22.2 | 93.4 | 95 | D6938 | Fail |
Location : | Lot #43, Elv/Depth :-2' from finish grade | |||||||||
Comment : | Recompaction and retesting required | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, November 9, 2022
Reviewer Name / DateKenneth Mosman, November 13, 2022