Daily Field Report

Date :11/18/2022
Project No :2022C136
Client Company :Century
Arrival Time :11/18/2022 11:30
Onsite Hours :05:30
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :Sunny
Departure Time :11/18/2022 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, our ASEC representative arrived on site to do the following:

1: Evaluate subgrade conditions for Lot #F19, Lot #B18, Lot #F17, Lot #B16 and Lot #F15.

The subgrade conditions for Lot #F19, Lot #B18, Lot #F17, Lot #B16 and Lot #F15 were observed to be prepared for concrete slab placement as per job specificiations. 

Dynamic Cone Penetrometer (DCP) tests were performed at several locations and depths at the at locations listed below.

DCP test results indicated that the soils at the locations listed and evaluation’s tested met the minimum requirement outlined in the specs for a net allowable bearing pressure of 2500 pcf.

Subgrade soil conditions should remain dry and free of loose soils/debris prior to concrete placement. If exposed to inclement weather, subgrade soils should be re-observed by ASEC prior to concrete placement.

DCP for lot F19                            DCP for Lot B18                           DCP for Lot Lot# F17                        DCP for Lot #B16                   DCP for LotF15   

Surface 6, 6, 7                              Surface 7, 7, 8                                Surface 4, 4, 8                            Surface 6, 6, 7                                  Surface 4, 4, 6

1′- 9, 9, 10                                       1′- 9, 10, 10                                        1′- 8, 8, 8                                      1′- 7, 8, 11                                           1′- 7, 8, 8

2′- 12, 12, 13                                   2′- 10, 10, 12                                      2′- 8, 8, 9                                     2′- 12, 13, 13                                      2′- 7, 7, 6

3′- 13, 14, 14                                    3′- 12, 12, 15+                                  3′- 7, 8, 8                                       3′- 16, 16, 20+                                   3′- 8, 8, 8

4′- 15, 15, 15+                                                                                            4′- 14, 14, 15+                                                                                       4′- 12, 17, 18+

Technician Signature / DateAminullah Azimi, November 18, 2022
Reviewer Name / DateKenneth Mosman, January 16, 2023