Skip to content

Daily Field Report

Date :11/21/2022
Project No :2022C205
Client Company :Pulte
Arrival Time :11/21/2022 09:00
Onsite Hours :03:00
Name of the Project :Enclave at Parkway Village
Project Location :Union City
Weather :Sunny
Departure Time :11/21/2022 12:00
ASEC Technician Name :Vidal Dias

Observations/Finding

As requested, our ASEC representative visited the site to visually inspect footings for a sub-wall for Lot #88.  The area was probed using a 3/8″ diamter probe rod.  Up to six (6) inches were removed in areas displaying soft soil.  DCP testing was also performed.  See results below.

DCP Data is below:

DCP LOCATION:
Lot #, North/South/Center etc
DCP-A
Depth
(feet)
Set
2″
N
1.75″
Description
1 4 Red, Silty fine to medium SAND with Clay.
2 15 Brown, Micaceous, Silty fine to medium SAND.
3 AR
DCP LOCATION:
Lot #, North/South/Center etc
DCP-B
Depth
(feet)
Set
2″
N
1.75″
Description
1 Red, Silty fine to medium SAND with Clay.
2 Brown, Micaceous, Silty fine to medium SAND.
3 AR
DCP LOCATION:
Lot #, North/South/Center etc
DCP-C
Depth
(feet)
Set
2″
N
1.75″
Description
1 5 Red, Silty fine to medium SAND with Clay.
2 AR AR
DCP LOCATION:
Lot #, North/South/Center etc
DCP-D
Depth
(feet)
Set
2″
N
1.75″
Description
1 5 Red, brown, Silty fine to medium SAND with Clay.
2 AR AR
DCP LOCATION:
Lot #, North/South/Center etc
DCP-E
Depth
(feet)
Set
2″
N
1.75″
Description
1 5 Red, Silty fine to medium SAND with Clay.
2 10 Brown, Micaceous, Silty fine to medium SAND.
3 AR
DCP LOCATION:
Lot #, North/South/Center etc
DCP-F
Depth
(feet)
Set
2″
N
1.75″
Description
1 7 Red, Silty fine to medium SAND with Clay.
2 AR AR

 

 

Based on the data we recommended that the top 1 foot of loose soils be removed. The remediation area is noted in pink on the attached diagram. DCP locations are marked in black.  The diagram and remediation recommendations were sent to Robert while on-site.

Technician Signature / DateVidal Dias, November 21, 2022
Reviewer Name / DateKenneth Mosman, January 16, 2023