Daily Field Report

Date :11/23/2022
Project No :2022C136
Client Company :Century
Arrival Time :11/23/2022 8:00
Onsite Hours :10:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :cloudy
Departure Time :11/23/2022 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, our ASEC representative visited the site for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. the following observations were observed on site this day.

Contractor continued work on Lot #41 to Lot #54, Fill was placed and spread using a dozer.  Compaction was performed using a sheeps-foot roller.

Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). 

Density test results indicate that the compacted materials met job specifications of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698).

Density testing result:

Moisture-Density Relationship (proctor) = 96.5 @ 22.2%

T1-elevation @ from finish grade, Yd 87.5, M%26.1, Compaction: 90.7%

T2-elevation @ finish grade, Yd 88.04, M%24.6, Compaction: 91.3%

T3-elevation @ finish grade, Yd 89.84, M%26, Compaction: 93.03%

T4-elevation @ finish grade, Yd 88.0, M%25.7, Compaction: 91.2 %

 

Technician Signature / DateAminullah Azimi, November 23, 2022
Reviewer Name / DateKenneth Mosman, January 16, 2023