- Daily Field Report Report ID: 55988
- This project is inactive from admin.Download Report
Daily Field Report
Date :01/05/2023
Project No :2022C136
Client Company :Century
Arrival Time :01/05/2023 8:30
Onsite Hours :07:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :Sunny
Departure Time :01/05/2023 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, the site was visited by our AS Engerineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals The following observations were observed on site this day.
Contractor continued work scarifying and aerating wet soils using a dozer. It was recommended to scarify these soils in drier weather to lower in-place moisture contents prior to recompaction.
Two in-place moisture content tests were performed with results of 39% and 29%. These values are well above optimum moisture.
Technician Signature / DateAminullah Azimi, January 5, 2023
Reviewer Name / DateKenneth Mosman, January 19, 2023