- Daily Field Report Report ID: 55999
- Edit Download Report
Daily Field Report
Date :01/06/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :01/06/2023 08:30
Onsite Hours :08:45
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :01/06/2023 17:20
ASEC Technician Name :Vidal Shengan
Observations/Finding
As requested, our AS Engineering & Consulting (ASEC) representative was on site to observe site activities:
Upon arrival, the contractor began the laying of pipe. The contractor proceeded to work on manhole A0 to manhole D1 according to project specifications.
The contractor excavated to a depth of 20 feet (with proper sloping). Ground water was encountered between a depth of 13′ to 20′ below grade. Mr. Ram Mogulla of ASEC recommended the placement of additional #57 stone to stabilize the subgrade prior to pipe and backfill placement. The contractor has been laying pipe for most of the day.
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/01/WhatsApp-Image-2023-01-06-at-3.12.55-PM.jpeg)
pipes above 12" to 18" of gravel
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/01/WhatsApp-Image-2023-01-06-at-3.14.20-PM.jpeg)
slope 0.85%
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/01/WhatsApp-Image-2023-01-06-at-3.15.38-PM.jpeg)
pipes covered with gravel
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/01/WhatsApp-Image-2023-01-06-at-10.50.13-PM.jpeg)
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/01/WhatsApp-Image-2023-01-06-at-10.59.27-PM.jpeg)
work location
Technician Signature / DateVidal Shengan, January 6, 2023
Reviewer Name / DateKenneth Mosman, April 06, 2023