Skip to content

Density Test Report

Date :01/07/2023
Project No :2022C136
Client Company :Century
Arrival Time :01/07/2023 8:30
Onsite Hours :07:30
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :cloudy
Departure Time :01/07/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/07/2023 1 30.1 88.0 P-3 96.5 22.2 91.2 90 D6938 Pass
Location : Lot #54, Elv/Depth :-1 from finished grade
Comment : Gauge Serial No. :85759
01/07/2023 2 33.1 87.6 P-3 96.5 22.2 90.8 90 D6938 Pass
Location : Lot #58, Elv/Depth :-1 from finished grade
Comment : Gauge Serial No. :85759
01/07/2023 3 30.2 87.9 P-3 96.5 22.2 91.1 90 D6938 Pass
Location : Lot #61, Elv/Depth :-1 from finished grade
Comment : Gauge Serial No. :85759
01/07/2023 4 27.2 92.8 P-1 99.0 21.4 93.7 90 D6938 Pass
Location : Lot #66, Elv/Depth :-1 from finished grade
Comment : Gauge Serial No. :85759
01/07/2023 5 27.9 90.7 P-1 99.0 21.4 91.6 90 D6938 Pass
Location : Lot #2, Elv/Depth :-3 from finished grade
Comment : Gauge Serial No. :85759
01/07/2023 6 24.9 93.8 P-1 99.0 21.4 94.7 90 D6938 Pass
Location : Lot #4, Elv/Depth :-3 from finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 7, 2023
Reviewer Name / DateKenneth Mosman, January 21, 2023