Daily Field Report

Date :01/09/2023
Project No :2022C136
Client Company :Century
Arrival Time :01/09/2023 8:00
Onsite Hours :07:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :Sunny
Departure Time :01/09/2023 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, our AS Engerineering and Consulting (ASEC) representative visited the site for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day:

Contractor continued work in scarifying and aerating wet soils using a dozer.   It was recommended to scarify the soils let the soils dry out and re-compact the area once soil moiture contents were back within optimum.

As of now, the soils were observed on this date to have high moisture contents.  Our representative performed 2 moisture content tests which measured 35% and 34%.

 

Technician Signature / DateAminullah Azimi, January 9, 2023
Reviewer Name / DateKenneth Mosman, January 22, 2023