Daily Field Report

Date :01/25/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :11/17/2022
Onsite Hours :
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :cloudy
Departure Time :11/17/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by the AS Engerineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. the following observations were observed on site this day.

Upon Arrival it was observed that topsoil was being was being placed on slopes behind Lot #422 in 12-to-18-inch lifts. (see photo).  Various equipment including excavators, off road dump trucks, and a compactor were used.

Technician Signature / DateRussell Hendrix, January 25, 2023