Daily Field Report

Date :01/25/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :12/17/2022
Onsite Hours :
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :12/17/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by our AS Engerineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. the following observations were observed on site this day.

Upon arrival various earth moving equipment (excavator, dozer, off road dump trucks, & 815F Caterpillar compactor) were being used to place a 12 to 18 inch lift at Lots #421, #422 & #423 as well as under a future roadway.  This lift was placed approximately 25 feet below finished grade.  Off-road trucks were causing some rutting and deflection as soil was being placed. (see photo). A 3/8-inch probe rod was used with a penetration of 3-5 inches in depth.   This was discussed with the 815F operator.  The surface of this area was removed, replaced and recompacted.

Technician Signature / DateRussell Hendrix, January 25, 2023
Reviewer Name / DateKenneth Mosman, January 29, 2023