Skip to content

Density Test Report

Date :01/26/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :01/26/2023 9:00
Onsite Hours :08:30
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :Sunny
Departure Time :01/26/2023 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/26/2023 1 15.2 95.7 P-01 100.4 18.6 95.3 90 D6938 Pass
Location : Lot #422, Elv/Depth :-13' from finished grade
Comment : Gauge Serial No. :85759
01/26/2023 2 16.6 96.3 P-01 100.4 18.6 95.9 90 D6938 Pass
Location : at the roadway, Elv/Depth :-14' from finished grade
Comment : Gauge Serial No. :85759
01/26/2023 3 17.5 96.3 P-01 100.4 18.6 95.9 90 D6938 Pass
Location : Lot #423, Elv/Depth :-14' from finished grade
Comment : Gauge Serial No. :85759
01/26/2023 4 16.8 94.4 P-01 100.4 18.6 94.0 90 D6938 Pass
Location : Lot #421, Elv/Depth :-14' from finished grade
Comment : Gauge Serial No. :85759
01/26/2023 5 15.8 95.2 P-01 100.4 18.6 94.8 95 D6938 Fail
Location : Lot #422, Elv/Depth :-13.5' from finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 26, 2023
Reviewer Name / DateKenneth Mosman, February 05, 2023