Skip to content

Daily Field Report

Date :02/06/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :02/06/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Sunny
Departure Time :02/06/2023 16:30
ASEC Technician Name :Vidal Dias

Observations/Finding

AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities.

During the visit, the following observations were made:

  1.  The contractor installed stakes over the previously prepared textile layer in unit 10, areas G7 and G8 and attached a ribbon to each stake to mark approximate elevations for placing the 825B aggregate. 
  2. As shown in the attached images, the green ribbon is the top elevation for the 825B GAB. 
  3. Each stake was measured at least 12″ from the subgrade, which meets the job specifications noted on drawing E720667. 

Photo documentation is included below: 

27 inch overlap on west section of wall.

27 inch overlap on south wall

25 inch overlap on basement floor

25 inch overlap within G8 region of basement wall

Technician Signature / DateVidal Dias, February 6, 2023
Reviewer Name / DateKenneth Mosman, February 12, 2023