Daily Field Report

Date :02/10/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :02/10/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Party Cloudy
Departure Time :02/10/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the
request of Jackson Demolition representative Josh Kelly. Our representative was present to
observe, verify and document the ongoing project activities.
During the visit, the following observations were made:

The contractor installed 508.38 tons of No. (24) stone over the previously prepared Terragrid layer in the lower half of the basement area G7 within the sump pit.
The No. (24) stone was placed according to the job specifications on drawing sheet E720667.

Photo documentation is included below:

As seen from Bakers Creek wall, near sump pit

Photographed facing east towards bakers creek wall.

Facing south east towards sump pit

Sump pit area

Technician Signature / DateVidal Dias, February 10, 2023