Skip to content

Density Test Report

Date :02/09/2023
Project No :2022C136
Client Company :Century
Arrival Time :02/09/2023 9:00
Onsite Hours :02:00
Name of the Project :Logan Pointe
Project Location :Loganville
Weather :cloudy
Departure Time :02/09/2023 11:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/09/2023 1 25.2 129.2 P-1 99.0 21.4 104.2 90 D6938 Pass
Location : Lot #31, Elv/Depth :at finished grade
Comment : Moisture exceeded from specified limit. Gauge Serial No. :85759
02/09/2023 2 25.1 101.3 P-1 99.0 21.4 102.3 D6938 Pass
Location : Lot #32, Elv/Depth :at finished grade
Comment : Moisture exceeded from specified limit.. Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 9, 2023
Reviewer Name / DateKenneth Mosman, February 12, 2023