Skip to content

Daily Field Report

Date :02/13/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :02/13/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Cloudy
Departure Time :02/13/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the

request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to

observe, verify and document the ongoing project activities.

During the visit, the following observations were made:

1. Fourteen (14) loads and 360.44 tons of No. 24 stone were delivered and placed in the sump area of the basement.

2. Nine (9) loads and 234.47 tons of riprap were delivered and stored near the southeast corner of the basement in area F6.

3.The No. 24 stone was placed according to the job specification on drawing sheet E720667.

Photo documentation is included below:

Riprap delivered and staged new the south east corner of the basement. Area G6

Riprap

This is placement of # 24 stone as seen facing bakers creek wall.

No. 24 stone placement in sump area

No 24 stone being place in the sump area.

Technician Signature / DateVidal Dias, February 13, 2023
Reviewer Name / DateRamchandra Mogulla, February 15, 2023