Date :02/14/2023
Project No :2022C205
Client Company :Pulte
Arrival Time :02/14/2023 16:00
Onsite Hours :01:00
Name of the Project :Enclave at Parkway Village
Project Location :Union City
Weather :Cloudy
Departure Time :02/14/2023 17:00
ASEC Technician Name :Vidal Shengan
Observations/Finding
Our ASEC representative visited the site to visually inspect footings for a wall for Lot #87. During the investigation unconsolidated soils were encountered in the top 12 inches of DCP locations 1,2, and 3. The contractor was notified to remove these soils.
Drawings and photos are included below.
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/02/Drawing.jpeg)
Drawing
![](https://assets.asec-na.com/asec/wp-content/uploads/2023/02/Lot-87.jpeg)
Lot 87
Technician Signature / DateVidal Dias, February 14, 2023