Daily Field Report

Date :02/14/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :02/14/2023 10:00
Onsite Hours :08:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :cloudy
Departure Time :02/14/2023 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Contractor continued backfill and compaction for Lots #422, 423, 424,426,427,428 and the roadway.

Upon arrival, work was already in progress with the contractor placing excessively thick lifts (16 inches).

The soils observed on this date did not appear to be placed in accordance with job specifications due to excessive lift thicknesses.  Contractor was notified.

Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759).

Density test results indicate that the compacted material met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698).

Density testing result:

P-01 Moisture-Density Relationship (proctor) = 100.4 pcf@ 18.6%

T1-elevation at finish grade@ lot 427, Yd 90.5, M%17, Compaction: 90.1%

T2-elevation -1.5 feet from finish grade@ lot 426, Yd 90.5 M%18.3, Compaction: 90.1 %

T3-elevation -5 feet from finish grade@ road, Yd 95.1, M%17.5, Compaction:94.7 %

T4-elevation -at finish grade@ lot 424, Yd 93.0, M%16, Compaction: 92.6 %

T5-elevation -1.5 feet from finish grade@ lot 423, Yd 95.5, M%17.3, Compaction: 95.1 %

T6-elevation – at finish grade@ lot 428, Yd 97.2, M%15.7, Compaction: 96.8 %

T7-elevation-2.5 feet from finish grade@ lot 422, Yd 94.2, M%16.7 , Compaction: 93.8 %

T8-elevation -1 foot from finish grade@ road, Yd 99.2, M%19.8, Compaction: 98.8 %

T9-elevation-0.5 feet from finish grade@ lot 423, Yd 97.2, M%16.2, Compaction: 96.8%

 

Technician Signature / DateAminullah Azimi, February 14, 2023
Reviewer Name / DateKenneth Mosman, February 19, 2023