- Home
- Daily Field Report Report ID: 57170
- This project is inactive from admin.Download Report
Daily Field Report
Date :02/17/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :02/17/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Rainy
Departure Time :02/17/2023 16:30
ASEC Technician Name :Vidal Dias
Observations/Finding
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities.
During the visit, the following observations were made:
- The contractor placed three rolls of fabric over the 24 stone in the lower half of the basement.
- The fabric was placed in accordance with the specifications and drawings.
- Rip rap was placed in the trench in areas F7 and F8.
Rip-rap installed in the trench in areas F7 and F8
Fabric with 2 feet of continuous overlap.
Rip-rap installed in the trench in areas F7 and F8
Rip-rap installed in the trench in areas F7 and F8
Rip-rap installed in the trench in areas F7 and F8
Fabric with 2 feet of continuous overlap.
Technician Signature / DateVidal Dias, February 17, 2023
Reviewer Name / DateRamchandra Mogulla, February 28, 2023