Concrete Test Report

Date :07/22/2022
Project No :2022C186
Client Company :Excellere
Arrival Time :07/22/2022 09:00
Onsite Hours :07:00
Name of the Project :Midblock Crosswalks
Project Location :Alpharetta
Weather :Clear and Sunny
Departure Time :07/22/2022 16:00
ASEC Technician Name :Jamal Geathers

Concrete Placement Information

Location(S): N/A
Testing: 1 Set of concrete specimens (5 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
1 Sets of concrete specimens/ 5 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:

Field Test Data

Set Number :1
Date Sampled :07/22/2022
Sampled By :Jamal Geathers
Contractor :Excellere
Truck Number :N/A
Time Batched :N/A
Location of Placement :N/A
Number of samples cast :5
Ambient Temperature (°f) :80
Slump (in.) :4
Water added (gal.) :N/A
Laboratory Number :N/A
Time Sampled :N/A
Weather Condition :Clear and Sunny
Concrete Supplier :Ready Mix USA
Mix ID :N/A
Quantity of Load (cu. yd.) :N/A
Sample Cast :1
Specified Strength :3000
Concrete Temperature(°f) :82
Air Content (%) :4.9
Unit Weight (pcf) :N/A

Strength Test Results

Specimen Number Scheduled Test Date Date Tested Age (days) Dia(in.) Area (sq in.) Maximum Loads (lbf) Strength (lbs) % Design Strength Type of Fracture

UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.

(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed

Technician Signature / DateKenneth Mosman, July 22, 2022
Reviewer Name / DateRamchandra Mogulla, February 24, 2023