Skip to content

Daily Field Report

Date :03/06/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :03/06/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Partly Cloudy
Departure Time :03/06/2023 16:30
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the

request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to

observe, verify and document the ongoing project activities.

During the visit, the following observations were made:

  1. The contractor received thirty-two loads (32) of silty clay material in area H8 of the basement. 
  2. The contractor visually checked each load and removed any loose organic materials before placement. The organic materials pile is currently located at the base of the ramp.
  3. The clay materials were placed in accordance with ITP-001

Photo documentation is included below: 

Clay being placed

2 foot mark shown on stake

Technician Signature / DateVidal Dias, March 6, 2023
Reviewer Name / DateRamchandra Mogulla, March 07, 2023