Daily Field Report

Date :03/07/2023
Project No :2022C135
Client Company :Mark Spain
Arrival Time :03/07/2023 8:30
Onsite Hours :03:00
Name of the Project : Barnett Shoals Road Development
Project Location :Watkinsville
Weather :Sunny
Departure Time :03/07/2023 11:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Compaction for the soils placed at the keyway continued today.

At the time of arrival, the contractor already placed soils and compacted to finished grade.

Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). 

Density test results indicate that the compacted materials met the project requirement of 95% of the maximum dry density obtained by the (Standard Proctor ASTM 698). 

Density testing results:

P-1 Moisture-Density Relationship (proctor) = 97.3 pcf @ 23.7%

T1-elevation at finish grade@ keyway, Yd 100.4 M%26, Compaction: 103 %

T2-elevation at finish grade@ keyway, Yd 99.68 M%26.9, Compaction: 102.4%

 

Technician Signature / DateAminullah Azimi, March 7, 2023
Reviewer Name / DateKenneth Mosman, March 14, 2023