Daily Field Report

Date :03/07/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :03/07/2023 10:45
Onsite Hours :07:15
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :Sunny
Departure Time :03/07/2023 18:00
ASEC Technician Name :Isaac Davis

Observations/Finding

At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Isaac Davis visited the job site to observe and monitor the contractor’s work activities from a quality stand point to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • Concrete was placed within the trench opening for the duct bank.
  • Concrete sampling and testing was performed on this day.
  • Sample location was DOA-A3D+310 to 410ft.
  • The contractor representatives were informed of the plastic properties.
  • Strength test results to follow after 28 days.

If you have any questions about our observations or recommendations stated in this report we will be more than glad to discuss them with you.

 

 

 

Technician Signature / DateIsaac Davis, March 7, 2023
Reviewer Name / DateRamchandra Mogulla, April 05, 2023