Density Test Report

Date :03/09/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/09/2023 8:00
Onsite Hours :08:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :cloudy
Departure Time :03/09/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/09/2023 1 24.6 94.7 3 99.4 21.3 95.3 95 D6938 Pass
Location : 32 feet to the SW of MH#D10, Elv/Depth :2 below finished grade
Comment : Gauge Serial No. :85759
03/09/2023 2 24.5 90.4 2 95.0 23.5 95.2 95 D6938 Pass
Location : 35 feet to the NE of MH#D10., Elv/Depth :6 feet below from finished grade
Comment : Gauge Serial No. :85759
03/09/2023 3 25.2 91.3 2 95.0 23.5 96.1 95 D6938 Pass
Location : 23 feet to the NE of MH#D10, Elv/Depth :5 feet below from finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 9, 2023
Reviewer Name / DateKenneth Mosman, April 06, 2023