Daily Field Report

Date :03/09/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/09/2023 8:00
Onsite Hours :08:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :cloudy
Departure Time :03/09/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. the following observations were observed on site this day.

Installation and backfilling of the sanitary sewer pipe between MH#D9 and MH#D11 continued today.

Upon arrival work was in progress with compaction performed using a CP-323C compactor.

Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). 

Density test results indicate that the compacted materials met the project requirement of 95% of the maximum dry density obtained by the (Standard Proctor ASTM 698).  Results are attached.

 

Technician Signature / DateAminullah Azimi, March 9, 2023
Reviewer Name / DateKenneth Mosman, April 06, 2023