Skip to content

Daily Field Report

Date :03/13/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :03/13/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Partly Cloudy
Departure Time :03/13/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities.
During the visit, the following observations were made:

  1. 803.85 tons (33 loads) of 825B were received and placed in sections (H6, G6, and F6).   The materials were placed in accordance with ITP-003.
  2. Terra fabric was placed in area F6 and overlain with 825B in accordance with ITP-003.
  3. Four (4) compaction tests were performed, and compaction test locations are labeled on the attached drawing. Tests were conducted per ITP-003 and were within the scope of the recommendations listed in ITP-003.

Photo documentation is included below:

Technician Signature / DateVidal Dias, March 13, 2023
Reviewer Name / DateRamchandra Mogulla, March 14, 2023