- Home
- Density Test Report Report ID: 57818
- This project is inactive from admin.Download Report
Density Test Report
Date :03/15/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/15/2023 8:30
Onsite Hours :05:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :03/15/2023 14:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 03/15/2023 | 1 | 31.2 | 84.8 | 3 | 99.4 | 21.3 | 85.3 | 90 | D6938 | Fail |
| Location : | 18 feet to the East of MH BA80, Elv/Depth :-8 feet from finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 03/15/2023 | 2 | 30.5 | 84.4 | 3 | 99.4 | 21.3 | 84.9 | 90 | D6938 | Fail |
| Location : | 16 feet to the East of MH BA80, Elv/Depth :-7 feet from finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
| 03/15/2023 | 3 | 34.2 | 81.1 | 3 | 99.4 | 21.3 | 81.6 | 90 | D6938 | Fail |
| Location : | 20 feet to the West of MH BA81, Elv/Depth :-7 feet from finished grade | |||||||||
| Comment : | Gauge Serial No. :85759 | |||||||||
Technician Signature / DateAminullah Azimi, March 15, 2023
Reviewer Name / DateKenneth Mosman, April 07, 2023
