Skip to content

Density Test Report

Date :03/20/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/20/2023 9:00
Onsite Hours :9:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :03/20/2023 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/20/2023 1 28.5 86.9 2 95.0 23.5 91.5 90 D6938 Pass
Location : 15 feet to the SW of SS-B1, Elv/Depth :-8 feet below from finished grade
Comment : Gauge Serial No. :85759
03/20/2023 2 27.4 86.2 2 95.0 23.5 90.7 D6938 Pass
Location : 23 feet to the SW of SS-B1, Elv/Depth :-7 feet below from finished grade
Comment : Gauge Serial No. :85759
03/20/2023 3 28.3 86.3 2 95.0 23.5 90.8 D6938 Pass
Location : 10 feet to the SW of SS-B1., Elv/Depth :6 feet below from finished grade
Comment : Gauge Serial No. :85759
03/20/2023 4 29.1 86.1 2 95.0 23.5 90.6 90 D6938 Pass
Location : 33 feet to the SW of SS-B1., Elv/Depth :4 feet below from finished grade
Comment : Gauge Serial No. :85759
03/20/2023 5 29.2 89.8 2 95.0 23.5 94.5 90 D6938 Pass
Location : 10 feet to the SW of SS-B1, Elv/Depth :3 feet below from finished grade
Comment : Gauge Serial No. :85759
03/20/2023 6 28.1 85.5 2 95.0 23.5 90.0 90 D6938 Fail
Location : 15 feet to the SW of SS-B1., Elv/Depth :2 feet below finished grade.
Comment : Gauge Serial No. :85759
03/20/2023 7 29.3 86.1 2 95.0 23.5 90.6 90 D6938 Pass
Location : 9 feet to the SW of SS-B1., Elv/Depth :1 foot below finished grad
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 20, 2023
Reviewer Name / DateKenneth Mosman, April 07, 2023