Date :03/29/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :03/29/2023 08:30
Onsite Hours :08:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :sunny/cloudy
Departure Time :03/29/2023 16:30
ASEC Technician Name :Isaac Davis

Observations/Finding

At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Isaac Davis visited the job site to observe and monitor the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • Work was being performed in the area of proposed Vault 2 on this day.
  • Rebar and form work for Vault 2 were installed.
  • The writer noted presence of #57 stone at the bottom of the footing.
  • The rebar installation was checked for spacing, size, grade of steel, overlap lengths, minimum cover and dimensions.
  • THe installed rebar and form work for the Vault 2 appear to be acceptable and in general accordance with project specifications and shop drawings.
  • Ram Mogulla with ASEC and Saketh Enukonda of ATL-QA were also present for the final inspection.

If you have any questions about our observations or recommendations stated in this report we will be more than glad to discuss them with you.

Rebar and Forms for Vault 2 foundations

Rebar and Forms for Vault 2 foundations

Rebar and Forms for Vault 2 foundations

Rebar and Forms for Vault 2 foundations

Technician Signature / DateIsaac Davis, March 29, 2023