Density Test Report

Date :03/31/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :03/31/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :cloudy
Departure Time :03/31/2023 16:30
ASEC Technician Name :Vidal Dias

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/31/2023 Test 1 15.8 112.1 43409 107.5 17.8 104.3 98 D6938 Pass
Location : Section-2 Basement area B8 at 20ft from the south end wall, Elv/Depth :286
Comment : Nuclear gauge test performed at section-2 in the basement area B7 which is done 20-ft from the south end wall of the basement. Gauge Serial No. :30942
03/31/2023 Test 2 15.3 108.8 43409 107.5 17.8 101.2 98 D6938 Pass
Location : Section-2 Basement area B8 at 22ft from the East End wall, Elv/Depth :286
Comment : Nuclear gauge test performed at section-2 in the basement area B7 which is done 20-ft from the south end wall of the basement. Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, March 31, 2023
Reviewer Name / DateRamchandra Mogulla, April 06, 2023