Skip to content

Density Test Report

Date :04/04/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/04/2023 11:30
Onsite Hours :06:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :04/04/2023 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/04/2023 1 29.1 87.0 2 95.0 23.5 91.6 90 D6938 Pass
Location : 15 feet to NE of MH AA40, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :85759
04/04/2023 2 29.5 85.7 2 95.0 23.5 90.2 90 D6938 Pass
Location : 18 feet to the SW of MH AA60, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 4, 2023
Reviewer Name / DateKenneth Mosman, April 07, 2023