Density Test Report

Date :04/06/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :04/06/2023 6:30
Onsite Hours :05:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :cloudy
Departure Time :04/06/2023 11:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/06/2023 1 0.0 NaN D6938 Pass
Location : Fiber vault #2, Elv/Depth :at finished grade
Comment : Duct bank cover. Compaction testing not required. Gauge Serial No. :85759
04/06/2023 2 0.0 NaN D6938 Pass
Location : Fiber vault #2, Elv/Depth :at finished grade
Comment : Duct bank cover. Compaction testing not required. Gauge Serial No. :85759
04/06/2023 3 0.0 NaN D6938 Pass
Location : Duct line East of vault#2, Elv/Depth :at finished grade
Comment : Duct bank cover. Compaction testing not required. Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 6, 2023
Reviewer Name / DateKenneth Mosman, September 18, 2023