Skip to content

Density Test Report

Date :04/10/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/10/2023 9:00
Onsite Hours :06:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :04/10/2023 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/10/2023 1 30.2 87.1 2 95.0 23.5 91.7 90 D6938 Pass
Location : 16 feet to NE of MH AA60, Elv/Depth :6 feet below finish grade
Comment : Moisture content is still exceeding from specified limit. Gauge Serial No. :85759
04/10/2023 2 29.6 88.1 2 95.0 23.5 92.7 90 D6938 Pass
Location : 120 feet to the NE of MH AA60, Elv/Depth :6.5 feet below finish grade
Comment : Moisture content is still exceeding from specified limit. Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, April 10, 2023
Reviewer Name / DateRamchandra Mogulla, April 21, 2023