Daily Field Report

Date :04/10/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :04/10/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Sunny
Departure Time :04/10/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (reference drawing E720661 S1 – R5, E720659 S1-R5.)

During the visit, the following observations were made:

  1. One thousand three hundred sixty-eight (1368) cubic yards of fill material was received and placed in section one of the basement. The materials were placed in general accordance with ITP-001. 

Photo documentation and test locations are attached: 

Grading operations - spreading fill material and exposing it to facilitate drying.

Fabric installed and well secured along the ramp.

Technician Signature / DateVidal Dias, April 10, 2023
Reviewer Name / DateRamchandra Mogulla, April 13, 2023