Daily Field Report

Date :04/19/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :04/19/2023 08:00
Onsite Hours :06:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :Sunny
Departure Time :04/19/2023 14:00
ASEC Technician Name :Isaac Davis

Observations/Finding

As requested, our AS Engineering & Consulting LLC representative was on site to perform a visual reinforcing steel inspection (for Vault #2).  Compaction around the manways (tech campus) was also performed.

Vault #2

  • Rebar spacing met job specifications.
  • Rebar gap between both top and bottom layers met job specifications.
  • Rebar was tied off and mounted as per job specifications.
  • Contractor put additional rebar to reinforce the areas that were deficient due to bollards.

Tech campus

  • The contractor filled in back section of manhole with M10 sand.
  • This area was probed with a 3/8-inch diameter probe rod and one density test performed.  Did not meet compaction requirements so no additional work was performed in this area at this time.
  • Following concrete placement around the conduit, compaction around manhole will be performed (and retested).

Technician Signature / DateIsaac Davis, April 19, 2023
Reviewer Name / DateKenneth Mosman, April 24, 2023