Daily Field Report

Date :04/21/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :04/21/2023 05:40
Onsite Hours :10:15
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Partly Cloudy
Departure Time :04/21/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R5, E720659 S1-R5.)

During the visit, the following observations were made.

  1. One thousand eight hundred thirty-six (1836) cubic yards of fill materials were placed for lift seven (7) in section 1 area B7 and lift five (5). The materials were placed in accordance with ITP-001.  Lift seven is highlighted in orange and lift five is highlighted in green. 
  2. Two moisture content and density tests were performed in section two (2) area G7 (E720659 S1-R5). The testing locations are highlighted in purple. 

Technician Signature / DateVidal Dias, April 21, 2023
Reviewer Name / DateRamchandra Mogulla, April 24, 2023