- Home
- Density Test Report Report ID: 58756
- Edit Download Report
Density Test Report
Date :04/20/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/20/2023 10:00
Onsite Hours :05:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :04/20/2023 15:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
04/20/2023 | 1 | 30.1 | 84.6 | 5 | 93.8 | 20.9 | 90.2 | 90 | D6938 | Pass |
Location : | 14 feet to north of MH BB5, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Moisture contents were found to be outside normal moisture content range. | Gauge Serial No. :85759 | ||||||||
04/20/2023 | 2 | 31.6 | 84.5 | 5 | 93.8 | 20.9 | 90.1 | 90 | D6938 | Pass |
Location : | 18 feet to south of MH BB10., Elv/Depth :3.5 feet below finished grade | |||||||||
Comment : | Moisture contents were found to be outside normal moisture content range. | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, April 20, 2023
Reviewer Name / DateKenneth Mosman, April 24, 2023