Daily Field Report

Date :04/25/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :04/25/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Sunny
Departure Time :04/25/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (reference drawing E720661 S1 – R5, E720659 S1-R5.)

During the visit, the following observations were made:

  1. One thousand six hundred twenty (1620) cubic yards of fill materials were received and placed for lift eight (8) section one (1) area B7 (drawing E720661). The materials were placed in accordance with ITP-001, and the fill area is highlighted in blue on the attached drawing. 
  2. During the evaluation, two density tests and one proctor check were performed. The results are attached, and test locations are highlighted in red on the attached drawing.

Photo documentation and test locations are noted below. 

 

 

Technician Signature / DateVidal Dias, April 25, 2023
Reviewer Name / DateRamchandra Mogulla, May 05, 2023