- Home
- Daily Field Report Report ID: 58932
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
The placement and compaction of backfill soils for the water storm pipe trench between manholes, MH BB10 to MH BB11 and BB12. continued this day.
At the time of arrival, our representative observed that work was in progress with lifts being placed at about 4 feet below finished grade and compacted using a CP-433C compactor.
Density test results indicate that the compacted materials met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698), however, moisture contents were found to be high.