Skip to content

Density Test Report

Date :05/01/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :05/01/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :05/01/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/01/2023 1 15.4 110.4 ASEC-2 110.9 15.3 99.5 90 D6938 Pass
Location : Section-2 Basement area G7, Elv/Depth :246.83
Comment : Test-1 performed in the Section-2 of the basement are G7 positioned at 66ft from east end wall and 102ft from the south end wall. Gauge Serial No. :30942
05/01/2023 2 14.6 108.0 ASEC-2 110.9 15.3 97.4 90 D6938 Pass
Location : section-2 basement area G7, Elv/Depth :246.83
Comment : Test-2 performed in the Section-2 of the basement are G7 positioned at 100ft from east end wall and 94ft from the south end wall. Gauge Serial No. :30942
05/01/2023 3 14.8 110.6 ASEC-2 110.9 15.3 Check
Location : Section-2 Basement area G7, Elv/Depth :246.83
Comment :
Technician Signature / DateAvinash Bandham, May 1, 2023
Reviewer Name / DateRamchandra Mogulla, May 05, 2023