Skip to content

Density Test Report

Date :05/01/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :05/01/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :05/01/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/01/2023 1 15.2 102.8 43409 107.5 17.8 95.6 90 D6938 Pass
Location : Section-2 Basement area G7, Elv/Depth :246.83
Comment : Test-1 performed in the Section-2 of the basement are G7 positioned at 66ft from east end wall and 102ft from the south end wall. Gauge Serial No. :30942
05/01/2023 2 15.8 106.0 43409 107.5 17.8 98.6 90 D6938 Pass
Location : section-2 basement area G7, Elv/Depth :246.83
Comment : Test-2 performed in the Section-2 of the basement are G7 positioned at 100ft from east end wall and 94ft from the south end wall. Gauge Serial No. :30942
05/01/2023 3 18.8 106.6 43409 107.5 17.8 Check
Location : Section-2 Basement area G7, Elv/Depth :246.83
Comment :
Technician Signature / DateAvinash Bandham, May 1, 2023
Reviewer Name / DateRamchandra Mogulla, May 02, 2023