Concrete Test Report

Date :04/21/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :04/21/2023 07:00
Onsite Hours :04:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :Sunny
Departure Time :04/21/2023 11:00
ASEC Technician Name :Isaac Davis

Concrete Placement Information

Location(S): N/A
Testing: One set Set of concrete specimens (6 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
One set Sets of concrete specimens/ 6 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks: Once arrived at the project for the concrete placement, I followed up on another observation of project to make sure everything was still acceptable. When the testing was completed, the Air was not in compliance with specifications. I discussed with the contractor about the air not falling into specification. On the second load another Air check was completed, and the air came up to 1.3%. The contractor was informed as well of the air not being in compliance with specifications. slump: 4.75 air: 2.5% temp: 63 unit weight: 144.4 pcf air re-check: 1.3 %

Field Test Data

Set Number :N/A
Date Sampled :04/21/2023
Sampled By :Isaac Davis
Contractor :Athena
Truck Number :239
Time Batched :07:26
Location of Placement :Generator pad at Vault #2
Number of samples cast :6
Ambient Temperature (°f) :59
Slump (in.) :4.75
Water added (gal.) :1
Laboratory Number :N/A
Time Sampled :07:53
Weather Condition :Sunny
Concrete Supplier :Ernest
Mix ID :45CA65
Quantity of Load (cu. yd.) :9
Sample Cast :One set
Specified Strength :4500
Concrete Temperature(°f) :63
Air Content (%) :2.5
Unit Weight (pcf) :N/A

Strength Test Results

Specimen Number Scheduled Test Date Date Tested Age (days) Dia(in.) Area (sq in.) Maximum Loads (lbf) Strength (lbs) % Design Strength Type of Fracture
1 04/28/2023
2 04/28/2023
3 05/05/2023
4 05/05/2023
5 05/12/2023
6 05/12/2023

UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.

(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed

Technician Signature / DateIsaac Davis, April 21, 2023
Reviewer Name / DateKenneth Mosman, May 07, 2023