Skip to content

Concrete Test Report

Date :04/21/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :04/21/2023 07:00
Onsite Hours :04:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :Sunny
Departure Time :04/21/2023 11:00
ASEC Technician Name :Isaac Davis

Concrete Placement Information

Location(S):
Testing: One set Set of concrete specimens (6 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Cylinders
Pick Up:
One set Sets of concrete cylinders/ 6 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks: Once arrived at the project for the concrete placement, I followed up on another observation of project to make sure everything was still acceptable. When the testing was completed, the Air was not in compliance with specifications. I discussed with the contractor about the air not falling into specification. On the second load another Air check was completed, and the air came up to 1.3%. The contractor was informed as well of the air not being in compliance with specifications. slump: 4.75 air: 2.5% temp: 63 unit weight: 144.4 pcf air re-check: 1.3 %

Field Test Data

Set Number :
Date Sampled :04/21/2023
Sampled By :Isaac Davis
Contractor :Athena
Truck Number :239
Time Batched :07:26
Location of Placement :Generator pad at Vault #2
Number of samples cast :6
Ambient Temperature (°f) :59
Slump (in.) :4.75
Water added (gal.) :1
Laboratory Number :
Time Sampled :07:53
Weather Condition :Sunny
Concrete Supplier :Ernest
Mix ID :45CA65
Quantity of Load (cu. yd.) :9
Sample Cast :One set
Specified Strength :4500
Concrete Temperature(°f) :63
Air Content (%) :2.5

Strength Test Results

Specimen Number Age (days) Date Tested Dia(in.) Area (sq in.) Maximum Loads (lbs) Strength (lbs) % Design Strength Type of Fracture
1
2
3
4
5
6

UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.

(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed

Technician Signature / DateIsaac Davis, April 21, 2023
Reviewer Name / DateKenneth Mosman, May 07, 2023