Skip to content

Density Test Report

Date :05/02/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :05/02/2023 10:30
Onsite Hours :05:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :05/02/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/02/2023 1 25.4 96.3 3 99.4 21.3 96.9 90 D6938 Pass
Location : 19 feet to SW of MH BB20,, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
05/02/2023 2 24.8 97.6 3 99.4 21.3 98.2 90 D6938 Pass
Location : 110 feet to SW of MHBB20, Elv/Depth :1 feet below finished grade
Comment : Gauge Serial No. :85759
05/02/2023 3 27.1 96.4 3 99.4 21.3 97.0 90 D6938 Pass
Location : 191 feet to SW of MH BB2,, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
05/02/2023 4 26.6 93.5 3 99.4 21.3 94.1 90 D6938 Pass
Location : 107 feet to NE of MH BB10,, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
05/02/2023 5 25.1 96.2 3 99.4 21.3 96.8 90 D6938 Pass
Location : 11 feet to SW of MH BB20,, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, May 2, 2023
Reviewer Name / DateKenneth Mosman, May 07, 2023