Skip to content

Density Test Report

Date :05/04/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :05/03/2023 10:00
Onsite Hours :05:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :05/03/2023 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/03/2023 1 21.2 98.5 3 99.4 21.3 99.1 90 D6938 Pass
Location : Between MH BB20 and MHBB30,, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
05/03/2023 2 24 91.9 3 99.4 21.3 92.5 90 D6938 Pass
Location : 53 feet to SE of MH BB30,, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
05/03/2023 3 25 91.5 3 99.4 21.3 92.1 90 D6938 Pass
Location : 63 feet to SE of MH BB30,, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
05/03/2023 4 25.1 94.1 3 99.4 21.3 94.7 90 D6938 Pass
Location : 33 feet to SE of MH BB30,, Elv/Depth :3.5 feet below finish grade
Comment : Gauge Serial No. :85759
05/03/2023 5 24.2 93.6 3 99.4 21.3 94.2 90 D6938 Pass
Location : 20 feet to NW of MH BB40,, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :
Technician Signature / DateAminullah Azimi, May 4, 2023
Reviewer Name / DateKenneth Mosman, May 07, 2023